UiTM PASIR GUDANG
1. Specification, technical data, unit rate & approved material email to konsesi & Quantity Surveyor (QS) tetapi hanya berjaya email specification sahaja kerana selebihnya ada pada bos. Esok baru boleh selesaikan.
2. Check voltage drop for temporary supply proposed by contractor but cannot consider their proposal because the value is more than 5%.
3. Dapatkan drawing from consultant IT untuk mengetahui lokasi TELCO room untuk dimasukkan dalam drawing infra.
4. Dapatkan information lokasi JB30 tetapi scope of work ini missing & masih tidak mengetahui siapa akan membuat skop kerja internal telephone so masuk dalam pending list.
SURAU KAJANG
1. Prepare M&E cost baru dan submit to QS.
2. Submit list of drawing baru ke QS.
TOWNHOUSE & CLUBHOUSE KAJANG
1. Check site plan drawing emailed by architect, come out with electrical requirement and reply back to architect.
2. Prepare M&E cost estimate and forward to QS.
PULAPES KERATONG
1. Check with contractor on BOMBA requirement for testing.
Finally... Done!!! Doakan semoga DN terus gigih untuk menyiapkan kerja-kerja DN. Banyak lagi kerja pending ni especially berkaitan nak kena cek drawing ni. Huhu... Caiyok DN!!! Ikhlaskan diri, insyaallah... segala usaha akan diberkati...